This is a clone of the Texas Administrative Code (TAC) for educational purposes. It is not the official version and should not be used for legal purposes. Site created Wed, 21 May 2025 21:16:51 GMT

TITLE 30 - ENVIRONMENTAL QUALITY
PART 1 - TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
CHAPTER 112 - CONTROL OF AIR POLLUTION FROM SULFUR COMPOUNDS
SUBCHAPTER F - REQUIREMENTS IN THE HUTCHINSON COUNTY NONATTAINMENT AREA
SECTION/RULE §112.222 - Control Requirements
Chapter Review Date 01/26/2024

(a) Hourly mass emissions of sulfur dioxide (SO2), on a block one-hour average, may not exceed the following:(1) 144.11 lb/hr SO2, for the Waste Heat Boiler - CDS Stack (EPN E-6BN); and(2) 750.05 lb/hr SO2, for the Combined Flare (EPN CFL).(b) Tail gas may only be combusted in a source whose emissions are routed to Waste Heat Boiler - CDS Stack (EPN E-6BN) or Combined Flare (EPN CFL).(c) The Unit 1 Reactor/Flare Unit 1 Reactor/Flare (EPN E-10FL), Unit 2 Reactor/Flare (EPN E-20FL), and Unit 4 Reactor/Flare (EPN E-40FL) may not operate on or after the compliance date in §112.228 of this title (relating to Compliance Schedules). (d) If the Combined Flare (EPN CFL) is not authorized and constructed by the compliance date in §112.228 of this title, no flaring is allowed until EPN CFL is authorized, constructed, and operating.(e) After construction and commencement of operation, the Combined Flare (EPN CFL) must meet the following parameters:(1) only receive tail gas when Waste Heat Boiler - CDS Stack (EPN E-6BN) is not operating; and(2) be constructed with a stack height of 65.00 meters and must be located at Universal Transverse Mercator (UTM) coordinates UTM East Meters 279745.85 and UTM North Meters 3949549.50 in UTM Zone 14.(f) The owner or operator may request an alternate means of control under the provisions of §112.232(k) of this title (relating to Control Requirements).

Source Note: The provisions of this §112.222 adopted to be effective October 27, 2022, 47 TexReg 6985.

View Official Rule