This is a clone of the Texas Administrative Code (TAC) for educational purposes. It is not the official version and should not be used for legal purposes. Site created Wed, 21 May 2025 21:16:52 GMT
The following tables are necessary for the proper location, planning, construction, and installation of an on-site sewage facility (OSSF).(1) Table I. Effluent Loading Requirements Based on Soil Classification.Attached Graphic(2) Table II. Septic Tank and Aerobic Treatment Unit Sizing.Attached Graphic(3) Table III. Wastewater Usage Rate.Attached Graphic(4) Table IV. Required Testing and Reporting.Attached Graphic(5) Table V. Criteria for Standard Subsurface Absorption Systems.Attached Graphic(6) Table VI. USDA Soil Textural Classifications.Attached Graphic(7) Table VII. Yearly Average Net Evaporation (Evaporation-Rainfall). Attached Graphic(8) Table VIII. OSSF Excavation Length (3 Feet in Width or Less).Attached Graphic(9) Table IX. OSSF System Designation.Attached Graphic(10) Table X. Minimum Required Separation Distances for On-Site Sewage Facilities.Attached Graphic(11) Table XI. Intermittent Sand Filter Media Specifications (ASTM C-33).Attached Graphic(12) Table XII. OSSF Maintenance Contracts, Affidavit, and Testing/Reporting Requirements.Attached Graphic(13) Table XIII. Disposal and Treatment Selection Criteria. Attached Graphic