This is a clone of the Texas Administrative Code (TAC) for educational purposes. It is not the official version and should not be used for legal purposes. Site created Wed, 21 May 2025 21:16:52 GMT
The commission may not issue a permit for a new facility or for the substantial change of an existing facility unless it finds that the proposed site, when evaluated in light of the proposed design, construction or operational features, minimizes possible contamination of water in the state. In making this determination, the commission may consider the following factors:(1) active geologic processes;(2) groundwater conditions such as groundwater flow rate, groundwater quality, length of flow path to points of discharge, and aquifer recharge or discharge conditions;(3) soil conditions such as stratigraphic profile and complexity, hydraulic conductivity of strata, and separation distance from the facility to the aquifer and points of discharge to surface water in the state; and(4) climatological conditions.