This is a clone of the Texas Administrative Code (TAC) for educational purposes. It is not the official version and should not be used for legal purposes. Site created Wed, 21 May 2025 21:16:53 GMT
(a) All-weather roads shall be provided within the facility to the unloading area(s) designated for wet-weather operation. The tracking of mud and debris onto public roadways from the facility shall be minimized.(b) Dust from on-site and other access roadways shall not become a nuisance to surrounding areas. A water source and necessary equipment or other means of dust control shall be provided.(c) All on-site and other access roadways shall be maintained on a regular basis. Access roadways shall be regraded as necessary to minimize depressions, ruts, and potholes.